Details

    • Epic Name:
      Marathon-lb release
    • Epic Status:
      Done
    • Total Story Points:
      3
    • Remaining Story Points:
      0
    • Progress (%):
      100
    • Progress Bar:
      100%

      Description

      This epic captures the tasks required to release a Marathon-LB package.

        Attachments

          Activity

            People

            • Assignee:
              dgoel Deepak Goel
              Reporter:
              avinash Avinash Sridharan (Inactive)
              Team:
              Networking Team
              Watchers:
              Avinash Sridharan (Inactive), Deepak Goel, Pawel Rozlach
            • Watchers:
              3 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: